Site supvisor: J Liu
Renovation outline
- Duration: 6 weeks
- Average construction time commitment: 30 hours per week
- Trade involves: General contractor, Window replacement
- Difficulty: Level 2
Highlights
- Vinyl flooring (2 days replacement)
- Kitchen countertop replacement
- Pendant lights
- Fireplace
- New garage
- Iron railing
Renovation description
Floor to ceiling windows! Open to below entrance! 11′ feet ceiling hight dining! That’s the house you want! This exceptional 1700 Sqft. living space 2-story single house with unique floorplans and partially developed basement. The 9′ feet ceilings main floor add to the dramatic impact of the ‘OPEN TO Below’ features enlarge the viewing of the great room. Spindle railings and built in fireplace brings in the classic look. kitchen equiped with quartz counter tops, glass pandent lights and storage pantry. Large windows and 11′ feet ceiling matching the chandelier in dining area. Second floor has a spacious owners suite with walk-in closet and a full ensuite bath; two additional bedrooms and a second full bath completing this floor. The developed family room in the basement is flooded with natural light from the open to below feature and large front windows. House comes with the 20’x22′ double detach garage. Main floor just replaced luxury vinyl flooring. Stove will be replaced to a brand new one.
Q&A
Due to the new garage, the project require to get city’s electrical permit for the garage and garage development permit and updated RPR.
How fast to do flooring change?
Carpet is about 2 days and vinyl floor is also about 2-3 days.