Renovation outline
- Duration: 6 months
- Average construction time commitment: 20 hours per week
- Trade involves: General contractor, Plumber, Electrician, Structure engineer, Landscaper, HVAC
- Difficulty: Level 4
Highlights
- Remove load-bearing walls
- Replace water boiler heater with com-bi system
- Open kitchen concept
- Basement second kitchen redo
- Fireplace in the living room
- Windows & patio door replacement
Renovation description
Second kitchen in the basement with separate entrance. Fully renovated 2 story house with a single attached garage and huge patio. 3+2 bedrooms, 2 full baths, 2 kitchens.
Q&A
Why would take 6 months to complete?
The best time to sell the property is next Spring season. Therefore, the project is taking slowly to finish.
Most houses use gas furnace for their heating source. The house is originally design to implement the water boiler heater. Therefore, replace with high-efficient boiler.
Why need the second kitchen in the basement?
This house is designed for the next owner to have additional rental income for supporting part of the mortgage payment.